Engineering works: Amsterdam - Hilversum; Amsterdam - Almere
Situation
Between Amsterdam Muiderpoort and Weesp the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, September 18, 2021 4:00 AM hours and Monday, September 20, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2600 Amsterdam C. - Almere C. is cancelled between Amsterdam Centraal and Almere Centrum
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Hoofddorp and Almere Oostvaarders
- Sprinter 14600 Amsterdam C. - Lelystad C. - Zwolle is cancelled between Amsterdam Centraal and Weesp (only in direction of Weesp)
- Sprinter 15800 Amsterdam C. - Vathorst is cancelled between Weesp and Amsterdam Centraal (only in direction of Amsterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 18, 2021 4:00 AM and Monday, September 20, 2021 2:00 AM.