Engineering works: Schiphol - Lelystad; Schiphol - Amersfoort
Situation
Between Amsterdam RAI and Weesp the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, September 18, 2021 1:00 AM hours and Monday, September 20, 2021 2:00 AM hours.
Advice
Passengers between Schiphol Airport and Amersfoort Centraal and Zwolle travel via Utrecht Centraal. The extra travel time is up to 30 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Amsterdam RAI, Duivendrecht, Diemen Zuid and Weesp.
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Den Haag Centraal and Groningen
- Intercity 1600 Schiphol Airport - Amersfoort C. - Hengelo - Enschede is cancelled between Schiphol Airport and Enschede
- Intercity 1700 Den Haag C. - Amersfoort C. - Hengelo - Enschede runs twice per hour between Den Haag Centraal and Enschede
- Intercity 1800 Den Haag C. - Schiphol Airport - Lelystad C. - Leeuwarden is cancelled between Den Haag Centraal and Leeuwarden
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Hoofddorp and Almere Oostvaarders
- Sprinter 4900 Utrecht C. - Hilversum - Almere C. continues to Lelystad Centrum from Utrecht Centraal
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Hilversum
- Intercity 11600 Schiphol Airport - Amersfoort C. - Schothorst is cancelled between Schiphol Airport and Amersfoort Schothorst
- Sprinter 14900 Utrecht C. - Hilversum - Almere C. continues to Lelystad Centrum from Utrecht Centraal
- Extra trein 28600 Den Haag C. - Leeuwarden is being diverted and will make an extra call at Gouda, Utrecht Centraal and Amersfoort Centraal between Den Haag Centraal and Leeuwarden
- Extra trein 28700 Den Haag C. - Groningen is being diverted and will make an extra call at Gouda, Utrecht Centraal and Amersfoort Centraal between Den Haag Centraal and Groningen
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen will make an extra stop at Amsterdam RAI
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Leiden Centraal and Lelystad Centrum
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo will make an extra stop at Amsterdam RAI
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen will make an extra stop at Amsterdam RAI
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 18, 2021 1:00 AM and Monday, September 20, 2021 2:00 AM.