Engineering works elsewhere: Schiphol - Utrecht - Nijmegen
Situation
Between Schiphol Airport and Arnhem Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time is about 15 minutes.
Period
On Friday, August 20, 2021 between 9:30 AM and 11:15 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 3000 Den Helder - Amsterdam C. - Utrecht C. - Nijmegen will make an extra stop at Driebergen-Zeist
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen is cancelled between Schiphol Airport and Arnhem Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, August 20, 2021 9:30 AM and Friday, August 20, 2021 11:15 PM.