engineering works

Engineering works: Almere - Lelystad

Situation

Between Almere Oostvaarders and Lelystad Centrum the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 15 minutes.

Period

In the night from Thursday to Friday, September 17, 2021 between 12:40 AM and 4:45 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, September 17, 2021 12:40 AM and Friday, September 17, 2021 4:45 AM.