Engineering works: Amsterdam - Enkhuizen
Situation
Between Hoogkarspel and Enkhuizen the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Thursday to Friday, September 17, 2021 between 12:35 AM and 4:45 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Bovenkarspel-Grootebroek, Bovenkarspel Flora and Enkhuizen.
-
Sprinter
3300
Kersenboogerd - Zaandam - Schiphol Airport - Leiden C.
- is cancelled between Enkhuizen and Hoogkarspel (only in direction of Hoogkarspel)
- is cancelled between Bovenkarspel-Grootebroek and Enkhuizen (only in direction of Enkhuizen)
- Intercity 3900 Enkhuizen - Utrecht C. - Eindhoven C. - Heerlen has a changed schedule between Amsterdam Centraal and Utrecht Centraal (only in direction of Utrecht Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Friday, September 17, 2021 12:35 AM and Friday, September 17, 2021 4:45 AM.