Engineering works: Groningen - Delfzijl
Situation
Between Bedum and Delfzijl buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Friday, October 22, 2021 4:00 AM hours and Monday, October 25, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Bedum, Stedum, Loppersum, Appingedam, Delfzijl West and Delfzijl.
- Stoptrein 37500 Groningen - Winschoten - Bad Nieuweschans is cancelled between Bedum and Delfzijl
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Friday, October 22, 2021 4:00 AM and Monday, October 25, 2021 2:00 AM.