engineering works

Engineering works: Amsterdam - Schiphol - Rotterdam (HSL)

Situation

Between Amsterdam Centraal and Rotterdam Centraal the timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Saturday, October 9, 2021 4:00 AM hours and Sunday, October 10, 2021 11:00 PM hours.

Last update:

Location of these engineering works

These engineering works take place between Amsterdam Centraal and Rotterdam Centraal.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, October 9, 2021 4:00 AM and Sunday, October 10, 2021 11:00 PM.