Unexpected engineering works: Leiden - Rotterdam
Situation
Between Leiden Centraal and Delft buses are running due to unexpected engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Monday to Tuesday, September 21, 2021 between 1:10 AM and 5:20 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Delft, Den Haag HS and Leiden Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is cancelled between Leiden Centraal and Delft
- Express buses are running between Leiden Centraal, Den Haag HS and Delft.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Tuesday, September 21, 2021 1:10 AM and Tuesday, September 21, 2021 5:20 AM.