Engineering works: Heerlen - Maastricht Randwyck
Situation
Between Maastricht and Valkenburg buses are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
Between Saturday, October 16, 2021 3:10 PM hours and Monday, October 18, 2021 5:15 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Maastricht, Maastricht Noord, Meerssen, Houthem-St. Gerlach and Valkenburg.
- Express buses are running between Maastricht and Valkenburg.
- Sneltrein 19800 to 19889 Maastricht - Heerlen - Aachen Hbf is cancelled between Maastricht and Valkenburg
- Stoptrein 32000 Randwyck - Heerlen - Kerkrade C. is cancelled between Maastricht Randwyck and Valkenburg
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, October 16, 2021 3:10 PM and Monday, October 18, 2021 5:15 AM.