Engineering works: Dordrecht - Eindhoven Centraal
Situation
Between Eindhoven Centraal and Dordrecht buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Saturday to Sunday, November 21, 2021 between 1:15 AM and 3:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 21400 to 21401 Rotterdam C. - Breda - Eindhoven C. is cancelled between Eindhoven Centraal and Dordrecht (only in direction of Dordrecht)
- Buses are running between Breda and Dordrecht.
- Intercity 3700 Dordrecht - Schiphol Airport - Utrecht C. - Venlo runs as extra service between Dordrecht and Rotterdam Centraal (only in direction of Rotterdam Centraal)
- Intercity 21400 to 21401 Rotterdam C. - Breda - Eindhoven C. is cancelled between Breda and Rotterdam Centraal (only in direction of Rotterdam Centraal)
- Buses are running between Tilburg, Breda and Dordrecht.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Sunday, November 21, 2021 1:15 AM to Sunday, November 21, 2021 1:30 AM
- Sunday, November 21, 2021 1:30 AM to Sunday, November 21, 2021 3:00 AM