Engineering works: Amsterdam - Köln - Frankfurt
Situation
Between Köln Messe/Deutz and Frankfurt (M) Hbf the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
On Friday, November 19, 2021 between 6:30 AM and 7:40 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- ICE International 120 to 129 Amsterdam C. - Utrecht C. - Arnhem C. - Frankfurt Hbf is cancelled between Köln Messe/Deutz and Frankfurt (M) Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, November 19, 2021 6:30 AM and Friday, November 19, 2021 7:40 AM.