Engineering works: Amersfoort - Zwolle
Situation
Between Zwolle and Nunspeet the timetable has been changed due to engineering works.
The extra travel time may be up to.
Period
In the night from Sunday to Monday, December 6, 2021 between 2:00 AM and 5:40 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Sprinter 5600 Utrecht C. - Amersfoort C. - Zwolle is cancelled between Zwolle and Nunspeet (only in direction of Nunspeet)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Monday, December 6, 2021 2:00 AM and Monday, December 6, 2021 5:40 AM.