Engineering works elsewhere: Schiphol - Lelystad
Situation
Between Schiphol Airport and Lelystad Centrum the timetable has been changed due to engineering works elsewhere.
The extra travel time may be up to.
Period
On Saturday, December 18, 2021 between 8:15 AM and 8:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Lelystad Centrum and Dordrecht
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp continues to Lelystad Centrum from Den Haag HS
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 18, 2021 8:15 AM and Saturday, December 18, 2021 8:30 PM.