Engineering works: Schiphol - Lelystad; Schiphol - Utrecht
Situation
Between Schiphol Airport and Utrecht Centraal the timetable has been changed due to engineering works.
Between Schiphol Airport and Lelystad Centrum the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, December 11, 2021 4:00 AM hours and Sunday, December 12, 2021 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1600 Schiphol Airport - Amersfoort C. - Hengelo - Enschede is cancelled between Schiphol Airport and Amsterdam Zuid
-
Intercity
2400
Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht
- runs today from/to Amsterdam Centraal between Schiphol Airport and Amsterdam Centraal
- is cancelled between Schiphol Airport and Lelystad Centrum
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen is cancelled between Schiphol Airport and Utrecht Centraal
-
Sprinter
3300
Kersenboogerd - Zaandam - Schiphol Airport - Leiden C.
- is cancelled between Leiden Centraal and Amsterdam Sloterdijk
- runs today from/to Amsterdam Centraal between Amsterdam Sloterdijk and Amsterdam Centraal
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo runs the entire day between Schiphol Airport and Venlo
-
Intercity
3700
Dordrecht - Schiphol Airport - Utrecht C. - Venlo
- is cancelled between Schiphol Airport and Venlo
- runs today from/to Amsterdam Centraal between Schiphol Airport and Amsterdam Centraal
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Diemen Zuid
- Sprinter 5800 Hoofddorp - Amsterdam C. is cancelled between Hoofddorp and Amsterdam Centraal
- Intercity 11600 Schiphol Airport - Amersfoort C. - Schothorst is cancelled between Schiphol Airport and Amsterdam Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, December 11, 2021 4:00 AM and Sunday, December 12, 2021 2:00 AM.