Engineering works: Amsterdam - Köln - Basel SBB
Situation
Between Amsterdam Centraal and Amsterdam Muiderpoort the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
On Sunday, December 19, 2021 between 8:15 PM and 9:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Speciale Trein 39421 to 39439 Amsterdam C. - Frankfurt Hbf is diverted and will not call at Oberhausen Hbf, Düsseldorf Hbf and Duisburg Hbf between Amsterdam Centraal and Frankfurt (M) Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, December 19, 2021 8:15 PM and Sunday, December 19, 2021 9:00 PM.