Engineering works: Hoofddorp - Schiphol - Hilversum
Situation
Between Hoofddorp and Hilversum the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Sunday, January 30, 2022 4:00 AM hours and Monday, January 31, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. runs as extra service between Amsterdam Centraal and Rotterdam Centraal
- Intercity 1600 Schiphol Airport - Amersfoort C. - Hengelo - Enschede is cancelled between Schiphol Airport and Hilversum
- Intercity 3100 Schiphol Airport - Utrecht C. - Nijmegen runs the entire day between Schiphol Airport and Nijmegen
- Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven C. - Venlo runs the entire day between Schiphol Airport and Eindhoven Centraal
- Intercity 11600 Schiphol Airport - Amersfoort C. - Schothorst is cancelled between Schiphol Airport and Hilversum
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is cancelled between Hoofddorp and Amsterdam Zuid
- Sprinter 5700 Utrecht C. - Hilversum - Hoofddorp is cancelled between Hoofddorp and Amsterdam Zuid
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 30, 2022 4:00 AM and Monday, January 31, 2022 2:00 AM.