Engineering works: Hilversum - Amersfoort
Situation
Between Amersfoort Centraal and Baarn buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Saturday to Sunday, February 6, 2022 between 4:35 AM and 5:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Amersfoort Centraal and Baarn.
- Sprinter 15800 Amsterdam C. - Vathorst is cancelled between Amersfoort Centraal and Baarn (only in direction of Baarn)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, February 6, 2022 4:35 AM and Sunday, February 6, 2022 5:30 AM.