Engineering works: Amsterdam - Schiphol - Rotterdam (HSL)
Situation
Between Amsterdam Centraal and Rotterdam Centraal the timetable has been changed due to engineering works.
Period
Between Saturday, April 2, 2022 5:45 AM hours and Monday, April 4, 2022 12:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda runs less often between Amsterdam Centraal and Schiphol Airport
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. runs less often between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 2, 2022 5:45 AM and Monday, April 4, 2022 12:30 AM.