Engineering works: Amsterdam - Passau - Wien
Situation
Between Amsterdam Centraal and Wien Hbf the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Sunday, February 27, 2022 6:45 PM hours and Monday, February 28, 2022 7:30 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Nightjet
420 to 421
Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch between Amsterdam Centraal and Wien Hbf
- is diverted and will not call at Arnhem Centraal and Duisburg Hbf between Amsterdam Centraal and Wien Hbf
-
Nightjet
420 to 421
Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf
- is diverted and will not call at Arnhem Centraal and Duisburg Hbf between Amsterdam Centraal and Wien Hbf
- is being diverted and will make an extra call at 's-Hertogenbosch between Amsterdam Centraal and Wien Hbf
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Sunday, February 27, 2022 6:45 PM to Sunday, February 27, 2022 7:30 PM
- Monday, February 28, 2022 6:45 PM to Monday, February 28, 2022 7:30 PM