engineering works

Engineering works: Schiphol - Lelystad; Schiphol - Amersfoort

Situation

Between Amsterdam RAI and Diemen Zuid the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, April 9, 2022 4:00 AM hours and Monday, April 11, 2022 2:00 AM hours.

Advice

Passengers from Schiphol Airport towards Almere Centrum and Lelystad Centrum travel via Amsterdam Centraal.
Passengers between Schiphol Airport and Amersfoort Centraal travel via Utrecht Centraal.
Passengers between Schiphol Airport and Deventer and Enschede travel via Utrecht Centraal and Arnhem Centraal.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, April 9, 2022 4:00 AM and Monday, April 11, 2022 2:00 AM.