Engineering works: Roosendaal - Vlissingen
Situation
Between Roosendaal and Vlissingen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, April 23, 2022 4:00 AM hours and Monday, April 25, 2022 2:00 AM hours.
Advice
Passengers between Arnemuiden and Goes travel via Middelburg.
Passengers between Kapelle-Biezelinge and Kruiningen-Yerseke travel via Goes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Roosendaal, Bergen op Zoom, Goes, Middelburg and Vlissingen.
- Minibuses are available between Goes and Kapelle-Biezelinge.
- Local buses are running between Roosendaal, Bergen op Zoom, Rilland-Bath, Krabbendijke, Kruiningen-Yerseke, Goes, Middelburg, Vlissingen Souburg and Vlissingen.
- Minibuses are available between Middelburg and Arnemuiden.
- Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen is cancelled between Roosendaal and Vlissingen
- Express buses are running between Roosendaal, Bergen op Zoom and Goes.
- Minibuses are available between Goes and Kapelle-Biezelinge.
- Local buses are running between Roosendaal, Bergen op Zoom, Rilland-Bath, Krabbendijke, Kruiningen-Yerseke and Goes.
- Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen is cancelled between Roosendaal and Goes
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between:
- Saturday, April 23, 2022 4:00 AM to Sunday, April 24, 2022 4:30 PM
- Sunday, April 24, 2022 4:30 PM to Monday, April 25, 2022 2:00 AM