Engineering works: Hoofddorp - Schiphol - Almere Oostvaarders
Situation
Between Weesp and Schiphol Airport the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Wednesday to Thursday, May 26, 2022 between 5:15 AM and 6:05 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Weesp, Diemen Zuid, Duivendrecht, Amsterdam RAI, Amsterdam Zuid and Schiphol Airport.
- Express buses are running between Weesp and Schiphol Airport.
- Sprinter 4300 Oostvaarders - Schiphol Airport - Hoofddorp is being diverted and will make an extra call at Amsterdam Centraal between Weesp and Schiphol Airport (only in direction of Schiphol Airport)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, May 26, 2022 5:15 AM and Thursday, May 26, 2022 6:05 AM.