Engineering works: Amsterdam - Passau - Wien
Situation
Between Amsterdam Centraal and Amsterdam Muiderpoort the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Monday, June 13, 2022 7:25 PM hours and Sunday, June 19, 2022 8:35 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Nightjet 420 to 421 Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf is diverted and will not call at Arnhem Centraal between Amsterdam Centraal and Basel SBB
-
Nightjet
420 to 421
Amsterdam C. - Utrecht C. - Nürnberg Hbf - Innsbruck Hbf/Wien Hbf
- does not call at Bonn Hbf
- is diverted and will not call at Arnhem Centraal between Amsterdam Centraal and Basel SBB
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, June 13, 2022 7:25 PM and Sunday, June 19, 2022 8:35 PM.