Engineering works: Gouda - Den Haag
Situation
Between Gouda and Zoetermeer Oost buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
On Sunday, June 5, 2022 between 7:15 AM and 9:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Gouda, Lansingerland-Zoetermeer and Zoetermeer Oost.
- Intercity 1700 Den Haag C. - Amersfoort C. - Hengelo - Enschede is cancelled between Utrecht Centraal and Den Haag Centraal
- Sprinter 6900 Den Haag C. - Utrecht C. - Tiel is cancelled between Gouda and Zoetermeer Oost
- Intercity 11700 Den Haag C. - Utrecht C. - Schothorst is cancelled between Den Haag Centraal and Utrecht Centraal (only in direction of Utrecht Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, June 5, 2022 7:15 AM and Sunday, June 5, 2022 9:30 AM.