Engineering works: Leiden - Rotterdam
Situation
Between Leiden Centraal and Rotterdam Centraal buses are running due to engineering works.
The extra travel time may be up to 45 minutes.
Period
In the night from Monday to Tuesday, May 17, 2022 between 2:30 AM and 4:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Leiden Centraal, Den Haag HS, Delft and Rotterdam Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is cancelled between Leiden Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Tuesday, May 17, 2022 2:30 AM and Tuesday, May 17, 2022 4:30 AM.