Engineering works: Amsterdam - Brussel - Paris (HSL)
Situation
Between Amsterdam Centraal and Brussel-Zuid Midi the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, July 16, 2022 4:00 AM hours and Monday, July 18, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Thalys
9300
Amsterdam C. - Rotterdam C. - Brussel-Z. Midi - Paris-Nord
- departs earlier from Amsterdam Centraal, Schiphol Airport and Rotterdam Centraal between Amsterdam Centraal and Antwerpen-Centraal (only in direction of Antwerpen-Centraal)
- departs later from Schiphol Airport and Rotterdam Centraal between Antwerpen-Centraal and Amsterdam Centraal (only in direction of Amsterdam Centraal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 16, 2022 4:00 AM and Monday, July 18, 2022 2:00 AM.