Engineering works: Amsterdam - Schiphol - Rotterdam (HSL)
Situation
Between Amsterdam Centraal and Rotterdam Centraal no trains are running on the high-speed line due to engineering works.
There is no additional travel time..
Period
Between Saturday, September 10, 2022 4:00 AM hours and Monday, September 12, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Amsterdam Centraal and Rotterdam Centraal
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
- Intercity 2100 Amsterdam C. - Haarlem - Den Haag C. runs the entire day between Amsterdam Centraal and Den Haag Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, September 10, 2022 4:00 AM and Monday, September 12, 2022 2:00 AM.