Engineering works: Amsterdam - Hannover - Berlin
Situation
Between Bad Bentheim and Berlin Hbf the international timetable has been changed due to engineering works.
The extra travel time may be up to.
Period
Between Saturday, August 27, 2022 4:00 AM hours and Saturday, September 17, 2022 2:00 AM hours.
Modified timetable
The timetable has not been modified for these engineering works.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, August 27, 2022 4:00 AM and Saturday, September 17, 2022 2:00 AM.