Engineering works: Zwolle - Groningen
Situation
Between Assen and Groningen buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Friday to Saturday, September 17, 2022 between 12:50 AM and 3:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Assen, Haren, Groningen Europapark and Groningen.
- Intercity 500 Rotterdam C. - Utrecht C. - Zwolle - Groningen is cancelled between Assen and Groningen (only in direction of Groningen)
- Intercity 700 Den Haag C. - Schiphol Airport - Lelystad C. - Groningen is cancelled between Assen and Groningen (only in direction of Groningen)
- Sprinter 8100 Zwolle - Groningen is cancelled between Groningen and Assen (only in direction of Assen)
- Buses are running between Groningen, Groningen Europapark, Haren and Assen.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, September 17, 2022 12:50 AM and Saturday, September 17, 2022 3:00 AM.