Engineering works: Amsterdam - Rotterdam - Breda (HSL)
Situation
Between Amsterdam Centraal and Breda the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Monday, September 12, 2022 4:00 AM hours and Thursday, September 15, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda runs only once per hour between Rotterdam Centraal and Breda
- Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. runs only once per hour between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, September 12, 2022 4:00 AM and Thursday, September 15, 2022 2:00 AM.