Engineering works: Maastricht - Liège / Luik
Situation
Between Maastricht Randwyck and Visé buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Sunday, September 4, 2022 10:00 PM hours and Monday, September 5, 2022 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Maastricht, Maastricht Randwyck and Eijsden.
- Stoptrein 5300 Maastricht - Liège-Guillemins is cancelled between Maastricht and Liège-Guillemins
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, September 4, 2022 10:00 PM and Monday, September 5, 2022 2:00 AM.