engineering works

Engineering works: Sittard - Maastricht; Roermond - Maastricht - Maastricht Randwyck

Situation

Between Sittard and Maastricht buses are running due to engineering works.
Between Sittard and Maastricht buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, November 19, 2022 4:00 AM hours and Monday, November 21, 2022 2:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, November 19, 2022 4:00 AM and Monday, November 21, 2022 2:00 AM.