Engineering works: Breda - Roosendaal
Situation
Between Breda and Roosendaal buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Friday to Saturday, December 3, 2022 between 12:45 AM and 1:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Breda, Etten-Leur and Roosendaal.
- Intercity 3600 Zwolle - Deventer - Nijmegen - Roosendaal is cancelled between Breda and Roosendaal (only in direction of Roosendaal)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, December 3, 2022 12:45 AM and Saturday, December 3, 2022 1:30 AM.