engineering works

Engineering works: Enschede - Gronau - Münster

Situation

Between Enschede and Münster (Westf) Hbf the international timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Sunday, December 4, 2022 12:30 AM hours and Saturday, December 10, 2022 5:00 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between:

  • Sunday, December 4, 2022 12:30 AM to Sunday, December 4, 2022 5:00 AM
  • Monday, December 5, 2022 12:30 AM to Monday, December 5, 2022 5:00 AM
  • Tuesday, December 6, 2022 12:30 AM to Tuesday, December 6, 2022 5:00 AM
  • Wednesday, December 7, 2022 12:30 AM to Wednesday, December 7, 2022 5:00 AM
  • Thursday, December 8, 2022 12:30 AM to Thursday, December 8, 2022 5:00 AM
  • Friday, December 9, 2022 12:30 AM to Friday, December 9, 2022 5:00 AM
  • Saturday, December 10, 2022 12:30 AM to Saturday, December 10, 2022 5:00 AM