Engineering works: Maastricht - Randwijck
Situation
Between Maastricht and Maastricht Randwyck buses are running due to engineering works.
Period
In the night from Sunday to Monday, November 21, 2022 between 12:00 AM and 1:30 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Maastricht and Maastricht Randwyck.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, November 21, 2022 12:00 AM and Monday, November 21, 2022 1:30 AM.