Engineering works: Utrecht - Baarn
Situation
Between Utrecht Overvecht and Baarn buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
In the night from Monday to Tuesday, December 6, 2022 between 12:25 AM and 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Utrecht Overvecht, Bilthoven, Den Dolder, Soest Zuid, Soest and Baarn.
- Sprinter 5500 Utrecht C. - Baarn is cancelled between Utrecht Overvecht and Baarn (only in direction of Baarn)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Tuesday, December 6, 2022 12:25 AM and Tuesday, December 6, 2022 2:00 AM.