Engineering works: Amsterdam - Köln - Frankfurt
Situation
Between Frankfurt Flughafen Fernb and Frankfurt (M) Hbf the international timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Wednesday, February 8, 2023 6:30 PM hours and Thursday, February 9, 2023 12:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- ICE International 220 to 229 Amsterdam C. - Utrecht C. - Arnhem C. - Frankfurt Hbf is cancelled between Frankfurt Flughafen Fernb and Frankfurt (M) Hbf (only in direction of Frankfurt (M) Hbf)
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, February 8, 2023 6:30 PM and Thursday, February 9, 2023 12:00 AM.