Engineering works: Amsterdam - Utrecht
Situation
Between Amsterdam Centraal and Amsterdam Muiderpoort the timetable has been changed due to engineering works.
Period
In the night from Saturday to Sunday, January 15, 2023 between 1:00 AM and 3:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Buses are running between Amsterdam Bijlmer ArenA and Amsterdam Centraal.
- Buses are running between Amsterdam Centraal, Amsterdam Muiderpoort, Amsterdam Bijlmer ArenA and Utrecht Centraal.
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is diverted and will not call at Amsterdam Bijlmer ArenA between Utrecht Centraal and Amsterdam Centraal
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. is diverted between Utrecht Centraal and Amsterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, January 15, 2023 1:00 AM and Sunday, January 15, 2023 3:00 AM.