Engineering works elsewhere: Leiden - Alphen a/d Rijn
Situation
Between Alphen a/d Rijn and Leiden Centraal the timetable has been changed due to engineering works elsewhere.
The extra travel time is more than 60 minutes.
Period
Between Saturday, January 28, 2023 12:45 AM hours and Monday, January 30, 2023 1:10 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Leiden Centraal (only in direction of Leiden Centraal)
- Buses are running between Alphen a/d Rijn, Leiden Lammenschans and Leiden Centraal.
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Leiden Centraal (only in direction of Leiden Centraal)
- Buses are running between Leiden Centraal, Leiden Lammenschans and Alphen a/d Rijn.
- Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Leiden Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between:
- Saturday, January 28, 2023 12:45 AM to Saturday, January 28, 2023 1:10 AM
- Saturday, January 28, 2023 10:40 PM to Sunday, January 29, 2023 1:20 AM
- Monday, January 30, 2023 12:45 AM to Monday, January 30, 2023 1:10 AM