Engineering works: Amsterdam - Hoofddorp
Situation
Between Amsterdam Centraal and Hoofddorp the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, February 18, 2023 4:00 AM hours and Monday, February 20, 2023 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1500 Amsterdam C. - Amersfoort C. continues to Amsterdam Lelylaan, Schiphol Airport and Hoofddorp from Amersfoort Centraal
- Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht runs as extra service between Amsterdam Centraal and Rotterdam Centraal
- Sprinter 4600 Zwolle - Schiphol Airport - Leiden C. - Den Haag C. is cancelled between Amsterdam Centraal and Den Haag Centraal
- Sprinter 5800 Hoofddorp - Amsterdam C. - Vathorst is cancelled between Amersfoort Vathorst and Hoofddorp
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, February 18, 2023 4:00 AM and Monday, February 20, 2023 2:00 AM.