engineering works

Engineering works: Heerlen - Aachen Hbf

Situation

Between Herzogenrath and Aachen Hbf buses are running due to engineering works.
The extra travel time is about 15 minutes.

Period

Between Friday, March 3, 2023 11:40 PM hours and Sunday, March 5, 2023 10:00 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Friday, March 3, 2023 11:40 PM and Sunday, March 5, 2023 10:00 PM.