Engineering works: Schiphol - Lelystad
Situation
Between Schiphol Airport and Almere Centrum the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Sunday, April 2, 2023 4:00 AM hours and Monday, April 3, 2023 2:00 AM hours.
Advice
Passengers between Almere Centrum and Schiphol Airport and Den Haag Centraal travel via Amsterdam Centraal.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
700
Den Haag C. - Groningen
- is cancelled between Almere Centrum and Den Haag Centraal
- continues to Amsterdam Centraal from Kampen Zuid
- Intercity 1600 Schiphol Airport - Enschede continues to Leiden Centraal and Den Haag Centraal from Enschede
-
Intercity
1800
Den Haag C. - Leeuwarden
- is cancelled between Almere Centrum and Den Haag Centraal
- continues to Amsterdam Centraal from Kampen Zuid
- Intercity 2400 Lelystad C. - Dordrecht runs as extra service between Amsterdam Centraal and Rotterdam Centraal
- Intercity 2600 Amsterdam C. - Almere C. is cancelled between Almere Centrum and Amsterdam Centraal
- Intercity 3700 Dordrecht - Venlo is cancelled between Schiphol Airport and Dordrecht
- Intercity 11600 Schiphol Airport - Schothorst continues to Leiden Centraal and Den Haag Centraal from Amersfoort Schothorst
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Sunday, April 2, 2023 4:00 AM and Monday, April 3, 2023 2:00 AM.