Engineering works: Amersfoort - Zwolle; Lelystad - Zwolle
Situation
Between 't Harde and Zwolle buses are running due to engineering works.
Between Kampen Zuid and Zwolle buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, April 1, 2023 1:00 AM hours and Monday, April 3, 2023 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Express buses are running between Kampen Zuid and Zwolle.
- Express buses are running between Nunspeet and Zwolle.
- Local buses are running between 't Harde, Wezep and Zwolle.
- Intercity 500 Rotterdam C. - Groningen is cancelled between Nunspeet and Zwolle
- Intercity 600 Rotterdam C. - Leeuwarden is cancelled between Nunspeet and Zwolle
- Intercity 700 Den Haag C. - Groningen is cancelled between Kampen Zuid and Zwolle
- Intercity 1800 Den Haag C. - Leeuwarden is cancelled between Kampen Zuid and Zwolle
- Sprinter 4600 Zwolle - Den Haag C. is cancelled between Kampen Zuid and Zwolle
- Sprinter 5600 Utrecht C. - Zwolle is cancelled between 't Harde and Zwolle
- Intercity 12600 Amsterdam C. - Groningen is cancelled between Kampen Zuid and Zwolle
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, April 1, 2023 1:00 AM and Monday, April 3, 2023 2:00 AM.