engineering works

Engineering works: Utrecht - Arnhem; Utrecht - Rhenen

Situation

Between Utrecht Centraal and Arnhem Centraal buses are running due to engineering works.
Between Rhenen and Utrecht Vaartsche Rijn the timetable has been changed due to engineering works.
The extra travel time is more than 30 minutes.

Period

On Sunday, April 16, 2023 between 4:00 AM and 9:20 AM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, April 16, 2023 4:00 AM and Sunday, April 16, 2023 9:20 AM.