engineering works

Engineering works: Utrecht - Hilversum.

Situation

Between Utrecht Overvecht and Hilversum the timetable has been adjusted and buses are running due to engineering works.
The extra travel time may be up to 30 minutes.

Period

Between Saturday, May 13, 2023 10:00 AM hours and Monday, May 15, 2023 2:00 AM hours.

Advice

Passengers between Utrecht Centraal and Hilversum travel via Amersfoort Centraal. The extra travel time is up to 30 minutes.
Passengers between Utrecht Centraal and Almere Centrum travel via Amsterdam Zuid. The extra travel time is up to 15 minutes.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Saturday, May 13, 2023 10:00 AM and Monday, May 15, 2023 2:00 AM.