Engineering works: Den Haag - Rotterdam.
Situation
Between Schiedam Centrum and Rotterdam Centraal buses are running due to engineering works.
The extra travel time may be up to 15 minutes.
Period
In the night from Tuesday to Wednesday, June 21, 2023 between 12:15 AM and 6:10 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1400 Utrecht C./Rotterdam C. - Rotterdam C./Utrecht C. is cancelled between Schiedam Centrum and Rotterdam Centraal
- Intercity 2200 Vlissingen/Amsterdam C. - Amsterdam C./Vlissingen is cancelled between Schiedam Centrum and Rotterdam Centraal (only in direction of Rotterdam Centraal)
- Buses are running between Rotterdam Centraal and Schiedam Centrum.
- Buses are running between Schiedam Centrum and Rotterdam Centraal.
- Buses are running between Schiedam Centrum and Rotterdam Centraal.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Wednesday, June 21, 2023 12:15 AM and Wednesday, June 21, 2023 6:10 AM.