Engineering works: Amsterdam - Utrecht; Amsterdam - Gouda
Situation
Between Amsterdam Centraal and Utrecht Centraal the timetable has been changed due to engineering works.
Between Amsterdam Muiderpoort and Woerden the timetable has been changed due to engineering works.
There is no additional travel time..
Period
Between Saturday, July 29, 2023 10:45 PM hours and Sunday, July 30, 2023 12:45 AM hours.
Advice
Passengers between Breukelen and Woerden and Gouda travel via Utrecht Centraal. The extra travel time is up to 30 minutes.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 2900 Enkhuizen/Maastricht - Maastricht/Enkhuizen is cancelled between Amsterdam Centraal and Utrecht Centraal
- Sprinter 4000 Uitgeest/Rotterdam C. - Rotterdam C./Uitgeest is cancelled between Amsterdam Centraal and Woerden
- Sprinter 7300 Breukelen/Rhenen - Rhenen/Breukelen runs as extra service between Amsterdam Centraal and Breukelen
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Saturday, July 29, 2023 10:45 PM and Sunday, July 30, 2023 12:45 AM.