Engineering works: Maastricht - Hasselt
Situation
Between Liège-Guillemins and Hasselt the timetable has been changed due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Monday, July 17, 2023 4:00 AM hours and Monday, August 28, 2023 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Stoptrein 5300 Maastricht/Liège-Guillemins - Liège-Guillemins/Maastricht is cancelled between Liège-Guillemins and Liers
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
No lines are linked (yet) to these engineering works.
Time periods
These engineering works are in effect between Monday, July 17, 2023 4:00 AM and Monday, August 28, 2023 2:00 AM.