Repair works: Amsterdam - Schiphol - Rotterdam (HSL)
Situation
Between Amsterdam Centraal and Rotterdam Centraal the timetable has been changed due to repair works.
The extra travel time may be up to 15 minutes.
Period
On Friday, August 11, 2023 between 10:30 AM and 1:00 PM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity direct 900 Rotterdam C./Amsterdam C. - Amsterdam C./Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Friday, August 11, 2023 10:30 AM and Friday, August 11, 2023 1:00 PM.