engineering works

Engineering works: Arnhem - Zutphen

Situation

Between Arnhem Centraal and Dieren buses are running due to engineering works.
The extra travel time is about 30 minutes.

Period

On Sunday, September 17, 2023 between 7:30 AM and 6:25 PM hours.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, September 17, 2023 7:30 AM and Sunday, September 17, 2023 6:25 PM.